Plan Title

Field Value
Status Proposed
Opened YYYY-MM-DD
Last updated YYYY-MM-DD
Owner Maintainer or working group
Target Milestone, stage, crate, or consumer
Related ADRs None
Related reviews None
Related CRs None
Depends on Existing capabilities, plans, or external work

Status

Summarize the present implementation state in one short paragraph. Distinguish completed evidence, active work, deferred work, and blockers.

Purpose

State the concrete outcome this plan exists to produce and why Tosumu needs it now. Describe the user, consumer, compatibility, correctness, or maintainability pressure rather than merely naming a feature.

Trigger And Evidence

Record the evidence that justifies implementation:

  • failing or missing behavior;
  • tests, fuzz findings, diagnostics, or benchmarks;
  • independent consumer requests;
  • repeated implementation friction;
  • relevant format, recovery, integrity, or security constraints.

Separate observed behavior from architectural guarantees.

Current State

Describe what exists today, including public APIs, crates, file-format behavior, tests, diagnostics, and known limitations. Link the owning source files and specifications.

Goals

  • Goal one.
  • Goal two.
  • Goal three.

Non-Goals

  • Explicitly deferred behavior.
  • Attractive adjacent work that this plan must not absorb.
  • Guarantees that current evidence does not support.

Ownership And Dependency Boundary

Describe who owns meaning, who owns storage mechanics, and which dependencies are permitted.

Consumer meaning
Adapter or relational semantics
Tosumu public storage contract
Pager, B+ tree, WAL, recovery, and physical format

This Work Owns

  • Semantics and decisions introduced by this plan.

This Work Must Not Own

  • Consumer-specific meaning.
  • Unrelated storage or platform policy.
  • Guarantees that belong to another layer.

Dependency Direction

State current and intended dependency direction. Identify forbidden upward, cyclic, consumer-specific, or physical-format dependencies.

Public Contract Impact

Identify proposed public types, functions, errors, diagnostics, format changes, or compatibility behavior. State which contracts remain provisional.

If the plan changes architecture, stop and open or update an Architectural Review and ADR before treating the new boundary as accepted.

Deliverables

  • [ ] Deliverable one.
  • [ ] Deliverable two.
  • [ ] Documentation and diagnostics updated.
  • [ ] Focused tests and consumer evidence added.

Implementation Slices

Each slice must compile and leave the repository in a coherent state. Add, remove, or split slices as evidence requires; do not mark a slice complete until all of its acceptance criteria and validation are satisfied.

Slice 0: Baseline And Boundary Confirmation

Objective: Capture current behavior and confirm that the proposed work fits accepted Tosumu ownership and compatibility boundaries.

Deliverables

  • [ ] Read the relevant engineering specifications, ADRs, Reviews, and CRs.
  • [ ] Record a focused baseline test, fixture, diagnostic, or measurement.
  • [ ] Identify public API and on-disk compatibility impact.
  • [ ] Open an Architectural Review if ownership remains unresolved.

Acceptance Criteria

  • [ ] The problem is reproducible or otherwise supported by concrete evidence.
  • [ ] Observation and guarantee are distinguished explicitly.
  • [ ] Dependencies and non-goals are documented.
  • [ ] No implementation work silently settles an open architecture question.

Validation

Commands, fixtures, reports, or manual evidence used for the baseline.

Exit State

Describe the stable state that permits Slice 1 to begin.

Slice 1: Smallest Useful Vertical Behavior

Objective: Implement the narrowest end-to-end behavior that proves the contract without speculative generalization.

Deliverables

  • [ ] Add the smallest compiling implementation.
  • [ ] Add typed errors and bounded diagnostics for expected failures.
  • [ ] Add focused unit and integration tests.
  • [ ] Exercise the behavior through one real caller.

Acceptance Criteria

  • [ ] Supported behavior succeeds deterministically.
  • [ ] Unsupported or invalid behavior fails explicitly.
  • [ ] No lower layer learns higher-level consumer semantics.
  • [ ] Existing format and recovery guarantees remain intact or are migrated deliberately.

Validation

cargo test -p owning-crate focused_test_name

Exit State

Describe the useful capability now available and the limitations intentionally left for later slices.

Slice 2: Hardening And Independent Pressure

Objective: Expand correctness evidence and test the boundary against another caller, failure mode, or compatibility case.

Deliverables

  • [ ] Add malformed, limit, rollback, recovery, or compatibility cases relevant to the feature.
  • [ ] Add a second independent caller or explain the evidence substitution.
  • [ ] Record divergences as provider-only behavior, contract refinements, or rejected semantics.
  • [ ] Update specifications and public documentation.

Acceptance Criteria

  • [ ] Failures remain typed, bounded, and inspectable.
  • [ ] Repeated operations do not corrupt identity, ordering, or durability.
  • [ ] Compatibility behavior is explicit and tested.
  • [ ] The public contract contains no accidental physical implementation leak.

Validation

cargo fmt --all -- --check
cargo clippy --workspace --all-targets -- -D warnings
cargo test --workspace --all-targets

Exit State

Describe whether the work is complete, remains incubating, or has exposed a new architectural question.

Slice N: Completion, Migration, Or Parking

Objective: Close the plan honestly rather than leaving ambiguous residual work.

Deliverables

  • [ ] Reconcile code, tests, engineering specifications, public docs, ADRs, and Reviews.
  • [ ] Record deferred work and unsupported behavior explicitly.
  • [ ] Remove superseded compatibility paths or document their lifetime.
  • [ ] Record final validation evidence.

Acceptance Criteria

  • [ ] All in-scope acceptance criteria pass.
  • [ ] Remaining work has an owner, destination, and reopening trigger.
  • [ ] The plan status accurately says completed, parked, superseded, or blocked.
  • [ ] No checklist item is marked complete solely because work moved out of sight.

Validation

Final commands and retained artifacts.

Exit State

State the final outcome in one direct paragraph.

Validation Matrix

Concern Evidence Command Or Artifact Required Result
Unit behavior Focused unit tests cargo test -p ... Pass
Cross-layer behavior Integration or consumer test Name Pass
Invalid input Rejection and limit tests Name Typed failure
Recovery and durability Crash/reopen fixture where relevant Name Documented guarantee
Compatibility Format/API fixture where relevant Name Explicit result
Fuzzing Decoder or mutation target where relevant Name No unexpected panic/corruption
Documentation Strict MkDocs build mkdocs build --strict Pass

Remove rows that genuinely do not apply and explain why. Add security, performance, WASM, .NET, or cross-version rows when the plan affects them.

Failure And Diagnostic Semantics

List expected failure classes and who owns each decision. Include limits, corruption, unsupported versions, incomplete writes, invalid consumer input, and unavailable providers where relevant.

No expected failure should rely only on a log message or silent fallback.

Compatibility And Migration

State effects on:

  • on-disk format and versioning;
  • WAL, checkpoint, backup, and recovery;
  • public Rust, CLI, and .NET APIs;
  • existing fixtures and consumers;
  • downgrade, rollback, and partial-migration behavior.

Write No impact only after checking each applicable boundary.

Security And Trust

State whether the work changes authenticated data, key/protector behavior, resource limits, untrusted-input parsing, integrity claims, or freshness evidence. Keep claims consistent with SECURITY.md.

Performance And Resource Bounds

Record relevant time, memory, file-size, page-count, allocation, or iteration bounds. Performance observations are evidence, not guarantees, unless an accepted contract says otherwise.

Risks And Mitigations

Risk Impact Mitigation Or Evidence
Example risk Consequence Test, bound, diagnostic, or design response

Completion Criteria

The plan is complete when:

  • [ ] all in-scope slices and acceptance criteria pass;
  • [ ] public behavior and unsupported cases are documented;
  • [ ] validation is repeatable;
  • [ ] architectural consequences are reflected in Reviews and ADRs;
  • [ ] deferred work is named rather than implied.

Parking Or Reopening Criteria

If the plan is parked, state why useful work should stop now. Name observable events that justify reopening, such as an independent consumer, a format failure, a recovery divergence, or new compatibility evidence.

Progress Log

YYYY-MM-DD

  • Work completed:
  • Validation:
  • Findings:
  • Plan changes:
  • Next slice:

Append progress entries; do not rewrite history to make the path look linear.

References

  • docs/Specifications/Tosumu Software Design Document.md
  • Relevant ADRs and Architectural Reviews
  • Relevant CRs, specifications, tests, fixtures, and source files